Monday 28th February 2011
a.m. 7.30-9.15 1hr 45mins 2/10
There were road-works on both the Fulham Palace Road (Hammersmith end) AND the Fulham Road with the collapsing building, just in case anyone thought they might have an easy journey to work on a Monday morning. What a treat. I wonder if the contractors will ever make the building safe. It’s a shame they didn’t just pull the whole thing down, it’s not even a little bit good-looking. I must say, though, that I was surprised that the façade of the old Abbey HQ in Baker Street didn’t collapse when the building behind was demolished. It made me rather nervous about standing at the bus stop on the other side of the road and I was jolly glad when they finally finished the building work last year. That took about 4-5 years and I imagine the Fulham Road one will take about the same. I’ll probably have retired by the time things get back to normal. Whatever normal is.
p.m. 5.35-7.00 1hr 25 mins 6/10
Gosh a normal journey. First time in ages. The parasites must be dozing.
No comments:
Post a Comment